Garbage bin mould in daily field,use LKM mold base, life time longer than 3000000 shots.
Dengfeng Mold provides a series of daily use dust bins and pallet moulds, collapsible pallet moulds, DF-mold is designing latest nesting container for international sales. The patent design collapsible crate pallet can be folded into smaller size for easy carry and strong to afford heavy weight and rough handling. DF offer recycled material injection system for collapsible crate to save your molding cost and keep your collapsible crate. Good cooling system design can make the mould more efficient.
Type: 240L, 360L, 450L, 550L, 660L,1000L dust bin moulds. Europe Standard pallet moulds 1200x 1000mm lightweight pallet, single face, double face pallet moulds.
· Mold steel: 45#, S50C, P20, H13, 1.2738, 1.2311, 718 and 718HH
· Plastic materials: PP, ABS, PC, HDPE, PS, nylon + GF, TPF and PVC
· Process: CNC, high speed engrave, EDM, wire cut and drill
· Hot runner system: Chinese, Yudo, Sino, HASCO and DME
· Standard mold parts: Chinese, DME and HASCO
· Design software: US, SolidWorks, Pro/E, 3D Max, AutoCAD and UG
· Minimum mold lifespan: depends on steel, at least 500,000 shots
· Hardness treatment: through nitrogen vacuum quenching
· Packing: wooden case
Specification: |
|
Certificates |
AAA grade credit enterprise, ISO9001, ISO14001, SGS |
Quality-guaranteed |
Japanese standard of QC management & Euramerican standards |
Service |
Designing the mould, CNC processing and other tooling, assemble all mould parts |
OEM & ODM service |
Acceptable |
Design software |
UG, PRO-E, CAD, CAXA, etc |
Mould base Standard |
LKM , HASCO , DME, etc |
Moulds’ steel |
NAK80, S136(H), 2738, 718&738 and P20 etc |
hardness of steel: |
15--60 HRC |
cav/core material |
2738,2343,DIN-1,S130,2344,738H,718,8407,S136,NAK80,P20 etc |
Cavity |
Single/multi |
Runner |
Hot/cold |
Mould life |
500,000-1,000,000 shots as you required |
Final products’ materials |
ABS, PP, PE, POM, PA6(66)+GF, PC, PMMA HIPS, GPPS etc |
Final Products’ colors |
Any color as your required |
Lead Time |
25-50 workdays based on the different products |
Relevant requirements reachable |
ROHS, UL, or as requested |
Package |
Wooden case package or follow customers' requirement |
Price Terms |
FOB Shanghai Port, China |
Payment term |
T/T, L/C at sight |